Aqua Stop Heavy-Duty Delineator

$895.00

Aqua Stop is an Australian-made, heavy-duty, high-mass water-fillable delineator designed for visual separation and site control across roadworks, civil and utility works, construction, infrastructure and industrial sites. It is particularly well suited to longer runs and more exposed environments where a substantial, highly visible delineator system is required.

Heavy-Duty Delineation for Longer, Exposed Runs
Aqua Stop provides a strong visual presence for temporary traffic guidance, work-zone separation, trenching and utility works, and other larger site-control applications.

Visibility and Accessory Support
Available in orange or white, Aqua Stop includes retroreflective tape and supports compatible mesh fencing, pole signage and lights, allowing the same run to provide additional visibility and site guidance where required.

APPLICATIONS

Built for demanding site separation

Aqua Stop is a heavy-duty, high-mass water-fillable delineator for roadworks, civil and utility works, construction, infrastructure and industrial sites. It is particularly suited to longer runs and more exposed environments where a substantial, highly visible separation system is required.

High-Mass Water-Filled

Australian Made

Fencing, Sign & Light Ready

Heavy-duty delineation for exposed sites
For longer runs and demanding work zones requiring greater separation and visibility, with support for mesh fencing, signage and lights.

Australian-Made

Designed and manufactured in Australia by Barrier Systems for use across roadworks, civil construction, infrastructure, utilities, mining and industrial sites. Our first-hand product knowledge supports practical guidance on its configuration, intended use and suitability for different worksite requirements.

CONFIGURE YOUR SYSTEM

Configure Aqua Stop for your site

Plan the connected run, water fill and accessory setup around the requirements of the site.

Water Fill & Mass

At 960 L fill capacity, each Aqua Stop unit reaches a filled mass of 1,020 kg for substantial high-mass delineation.

Connect Your Run

Aqua Stop units connect using steel drop pins, with each connected unit adding 2,000 mm of effective run length.

Add Fencing, Signs & Lights

Compatible mesh fencing, pole signage and lights can be added clear signalling is required.

GET IN TOUCH

Have a Quick Question?

Need a quick answer about a product, availability or which option may suit your needs? Send us a message and our team will get back to you.





    Technical Specifications

    PRODUCT Aqua Stop | Heavy-Duty Water-Fillable Delineator
    Overall length
    2,135 mm
    Effective connected length
    2,000 mm per unit
    Maximum width
    600 mm
    Overall height
    1,060 mm
    Empty mass
    60 kg
    Recommended water fill
    960 L
    Mass at recommended fill
    1,020 kg
    Material
    LLDPE
    UV stabilisation
    UV20
    Connection method
    Steel connecting pin
    Joint movement
    Up to 15°
    Reflective markers
    Class 400 prismatic reflective tape
    Accessory provisions
    Supports compatible fencing, signage and lights
    AS 1742.3:2019
    Low-Speed Impact Tested
    Rotationally Moulded

    Technical FAQs

    Quick answers to common technical questions about Barrier Systems products, installation, specifications, testing and technical documentation.

    What makes Aqua Stop a heavy-duty water-filled delineator?

    Aqua Stop combines a large overall format with a high fill capacity and substantial filled mass. Each unit holds 960L of water and weighs 1,020kg when full. At 2,135mm long, 1,060mm high and 600mm wide, it provides a substantial on-site presence for visual delineation and site separation.

    • 960L fill capacity per unit
    • 1,020kg filled weight
    • 2,135mm long, 1,060mm high and 600mm wide
    Is Aqua Stop a safety or crash barrier?

    No. Aqua Stop is a heavy-duty water-filled delineator, not a safety or crash barrier. It has demonstrated impact performance in low-speed environments, but it should not be used where tested redirective vehicle containment is required. For those applications, SHIELD I is the appropriate Barrier Systems product.

    Is Aqua Stop suitable for longer runs and more exposed sites?

    Aqua Stop is intended as a water-filled delineator for long runs and more exposed sites where greater filled mass is practically useful. Each unit contributes 2,000mm of effective length to the connected run, helping cover the required boundary with fewer individual units and connections. Once filled with 960L of water, each unit weighs 1,020kg, providing substantial on-site mass to help resist unintended movement. Separate drop pins form strong, secure connections between adjoining units.

    • 2,000mm effective length per unit
    • 1,020kg filled weight per unit
    • Strong, secure drop-pin connection along the run

    Site conditions, ground surface, layout and intended use should still be considered when confirming suitability.

    Is Aqua Stop a movement-resistant water-filled delineator?

    When full, each unit holds 960L of water and weighs 1,020kg. This substantial filled mass helps the heavy-duty water-filled delineator resist unintended movement and stay put once the run has been correctly positioned and filled. Separate drop pins form strong, secure connections between adjoining units.

    • 960L fill capacity per unit
    • 1,020kg filled weight per unit
    • Strong, secure drop-pin connections

    Filled mass should not be treated as a tested movement- or wind-resistance rating. Ground surface, slope, run configuration, site activity and environmental conditions should still be considered when confirming suitability.

    Can Aqua Stop be fitted with mesh fencing, lights or signage?

    Each Aqua Stop unit has two top apertures for compatible mesh fencing, hazard lights or pole signage. These provisions allow additional visibility and site guidance to be incorporated along the connected run where required.

    • Mesh fencing for a more continuous visual boundary
    • Hazard lights for additional low-light visibility
    • Pole signage for site information or directional guidance

    Accessory compatibility, fittings and the complete configuration should be confirmed for the intended site use.

    Can this water-filled roadwork delineator define traffic routes?

    Yes. Linked into a continuous run, this water-filled delineator for roadworks can define temporary traffic routes, changed access points and active work-zone boundaries. Each unit contributes 2,000mm of effective length, while orange and white configurations and retroreflective tape help keep the route clearly identifiable.

    • Define temporary or changed traffic routes
    • Mark access points, work-zone boundaries and planned closures
    • Extend visual delineation across larger roadwork areas

    It can also be used as a water-filled road-closure delineator where the approved traffic-management plan requires visual guidance rather than tested vehicle containment. This water-filled traffic delineator is not crash-rated or redirective. Where tested containment is required, consider the SHIELD I redirective barrier system.

    Where can a water-filled construction site delineator be used?

    A water-filled civil works delineator can define active work areas, temporary site access routes, plant and equipment zones, material laydown areas and planned stage boundaries. Connected units form a substantial visual boundary for layouts intended to remain in place once filled.

    • Define active civil and construction work areas
    • Mark temporary site access routes and planned stage boundaries
    • Visually separate plant, equipment and material laydown zones

    Used as a water-filled worksite delineator, it provides visual delineation and site separation rather than tested vehicle containment. When selecting a water-filled delineator for civil works or a construction site, consider the ground conditions, run layout, site activity and required separation function.

    Which worksite barriers suit temporary site separation?

    The right worksite barriers depend on the function required. Where construction site barriers or temporary site barriers are needed for visual guidance, this heavy-duty water-filled delineator can define active work areas, access routes, plant and equipment zones and material laydown areas. Connected units form a substantial visual boundary for layouts intended to remain in place once filled.

    • Mark temporary work-zone and construction-stage boundaries
    • Define site access routes and work-area separation
    • Visually separate plant, equipment and material zones

    When comparing water-filled worksite barriers or water-filled barriers for construction sites, confirm whether the required function is delineation or containment. A water-filled temporary site separation barrier intended for visual guidance performs a different role from a tested traffic-containment system.

    This product is not a water-filled crash barrier or water-filled redirective barrier. Where tested vehicle containment is required, consider the SHIELD I redirective barrier.

    Can this delineator support trenching and utility works?

    This heavy-duty water-filled delineator can form a substantial visual boundary for trenching, underground-services, utility-maintenance and infrastructure work areas. Connected runs can define temporary site routes and planned stage boundaries alongside drainage, sewer, stormwater, pipeline, pipe-laying and water-main works.

    • Delineate utility excavations and active trenching areas
    • Define temporary site routes and staged work boundaries
    • Form longer connected lines along linear infrastructure works

    Each unit provides 2,000mm of effective length and connects using separate drop pins, helping longer boundaries be formed with fewer individual units and connections. Once filled to 1,020kg, each unit provides substantial on-site mass where a more stationary delineator run is useful.

    Its role is visual delineation and site separation. It is not trench shoring, excavation edge protection or a redirective vehicle barrier. Ground conditions, excavation setbacks, traffic environment, site layout and the required separation function should be considered when confirming suitability.

    Can this delineator be supplied in project quantities?

    The displayed price supports straightforward online ordering. Where quantity, run length, timing or freight needs to be planned, Barrier Systems can prepare a project quote for Aqua Stop supply around the actual requirements.

    • Required quantity or total run length
    • Orange, white or mixed-colour requirements
    • Required date and delivery location
    • Site application and any suitability questions

    Our Australian rotational-moulding capability allows project requirements to be considered alongside stock already on hand, production timing and freight planning. Availability and lead times depend on the order quantity, production schedule, destination and delivery requirements, so they should be confirmed for each project.

    For quantity- or delivery-sensitive requirements, contact Barrier Systems with these details so current availability, the project quote and a practical delivery plan can be confirmed.

    Where can this delineator be used on infrastructure and utility projects?

    As a water-filled infrastructure works delineator, it can form connected visual boundaries around active work areas, temporary access routes and changing project-stage limits. Typical applications include:

    • Trenching, excavation and underground-service works
    • Drainage, sewer, stormwater, pipeline and water-main works
    • Electrical and telecommunications installation, repair and maintenance
    • Temporary access points and maintenance zones around public infrastructure

    Used as a water-filled utility works delineator, it can mark work-zone limits, access points and maintenance areas where substantial visual separation is required. Its connected, high-mass format also suits planned layouts requiring a water-filled utility maintenance delineator or water-filled trenching works delineator.

    When selecting a water-filled delineator for infrastructure works or a water-filled delineator for utility works, consider ground conditions, the traffic environment, access requirements, run layout and the required separation function. It provides visual delineation and site separation, but not excavation edge protection, fall prevention or tested vehicle containment.

    Aqua Stop Technical Resources

    Manuals, product information and technical references for Aqua Stop.

    Aqua Stop Product Overview

    Aqua Stop
    Product Overview

    Summary of Aqua Stop dimensions, fill, mass, connection method and accessory provisions.

    Aqua Stop Product & Installation Manual

    Aqua Stop
    Product & Installation Manual

    Product, handling, connection and installation information for the Aqua Stop system.

    Aqua Stop Specifications & Data Sheet

    Aqua Stop
    Specifications & Data Sheet

    Technical reference covering Aqua Stop dimensions, materials, water fill, mass and configuration.

    Aqua Stop Logistics & Packing Guide

    Aqua Stop
    Logistics & Packing Guide

    Packing, transport and logistics planning information for Aqua Stop.